Production or revision of the operational state documents, derived from the FMEA and the trials. These are the documents that translate an engineering analysis into an instruction the bridge can act on at three in the morning.
Declared so the conversation happens before the campaign, not in the middle of it.
These drive effort, not price. Pricing is quoted after the specification call, together with the documents we will need from you.
This scope is not sellable in isolation without a current FMEA. IMCA M 166 §2.7 is explicit: the ASOG depends on the FMEA and the proving trials to identify post-failure capability correctly and to name the failures that require the DP operation to be suspended. An ASOG written without them is a document that reads correct and is not.