Dynamic Positioning Assurance 11 DP FMEA DP Annual Trials 5-Yearly DP Trials DP Acceptance Test CAM / TAM / ASOG DP Gap Analysis DP Incident Investigation DP Assurance Company DP Authority Support DP Competence Assessment Continuous Professional Development All Dynamic Positioning Assurance scopes →
Audits & Certification 4 Statutory Internal Audit — ISM · ISPS · MLC ISO Management Systems — 9001 · 14001 · 45001 Procedures & Checklists Development ISM & ISPS Implementation All Audits & Certification scopes →
Vetting & Inspection Readiness 4 RightShip Preparation Pre-Purchase Inspection Vetting Preparation — OVID & SIRE 2.0 USCG & Port State Preparation All Vetting & Inspection Readiness scopes →
Marine Surveys & Consultancy 5 Condition Survey Bunker Survey On-hire / Off-hire Survey Technical Inspection Marine Consultancy All Marine Surveys & Consultancy scopes →
All services Technology Ecosystem About Contact Contact us
Home/Services/Dynamic Positioning Assurance/DP Annual Trials
Dynamic Positioning Assurance

DP Annual Trials

Annual verification of DP capability against the demonstrated baseline
Normative anchor
IMCA M 190 Rev 3.2 — IMCA M 191 Rev 1.1 for MODUs
Answers to
Company DP Authority
Charging unit
Day rate on board + mobilisation
Primary output
Annual Trials report to M 190 Appendix 1

Annual verification that the vessel maintains the capability established by the FMEA and the proving trials, tested over performance, protection and detection. Where the vessel is a MODU, the programme follows IMCA M 191 Rev 1.1 rather than M 190.

In scope

  • Verification over the three elements of the redundancy concept: performance, that the redundant elements remain sufficient in number and capacity; protection, that common nodes and cross-connections do not propagate failure beyond the WCFDI; detection, that an alarm reveals a compromised redundancy before the second failure arrives.
  • Execution of the annual programme in the agreed mode — dedicated, cumulative or digital.
  • Maintenance of the rolling test matrix across the five-year cycle.
  • Review and update of the ASOG against what the trials found.
  • Daily debrief on board, so that no finding first appears in the report.

Not in scope

  • Destructive testing of any kind.
  • Exploration of failure modes not foreseen in the FMEA. That is a proving trial, and it is bought as one.
  • Repair or adjustment of equipment found defective during the programme.

Declared so the conversation happens before the campaign, not in the middle of it.

Deliverables

What you receive

  1. Annual Trials report in the IMCA M 190 Appendix 1 structure, including the rolling test matrix and Annex A.
  2. Completed test sheets, one per test, recording criterion and observed result.
  3. Updated ASOG.
  4. Detailed Service Report.
  5. Crew summary.
Scoping

What drives the effort

These move the size of the campaign. None of them moves the standard it is measured against.

These drive effort, not price. Pricing is quoted after the specification call, together with the documents we will need from you.

Related scopes

What usually goes with it

Next step

DP Annual Trials — let's scope it against your vessel.

Contact us Or email the technical team
Polaris Ducit